SIXTH OF OCTOBER RAW WATER TRANSMISSION LINE



Client: Ministry of Housing, Utilities, and Urban Development - The Construction Authority for Potable Water and Wastewater (CAPW). 
Location: 6th of October City – Egypt. 
Duration: 2010 – 2014. 
Project Facts:
  • Financed by the Egyptian Government. 
  • Produces 1.7 million m3 per day to supply the 6th of October City Wastewater Water Treatment Plant with raw water. 
  • The intake and booster stations have 12 pumps of 1.5 MW capacity each. 
  • The pipe lines spans approximately 120 km of steel between El Badrashain and Dahshour. 
  • Reinforced Concrete Pipes for this project were supplied by HAC's pipe manufacturing division (NPC). 
Scope of work:
  • 40 km steel pipe line (2.2 diameter). 
  • 78 km RC pipe line (2.2 diameter). 
  • Nile intake and pump house. 
  • Booster stations.
Subscribe *
 